Transforming Pups into Well-Behaved Companions – Trusted Training Tools for Every Dog!

Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)

$19.98

Dog Training Leash : Elevate your dog’s recall skills with our dog waterproof leash. Ideal for outdoor activities like hiking, camping, and beach play, it fosters better obedience and a closer bond.
Weatherproof Durability : Crafted from PVC coated nylon webbing, our dog waterproof leash remains lightweight and strong even when wet. It’s weatherproof, easy to clean, anti-odor and perfect for all conditions.
Strong and Soft leash : Experience a leash that’s both strong and gentle. With a remarkable 600 lbs pull force resistance, it offers safety and comfort in various weather conditions.

$19.98

0
Add to compare

Canine Coaching Leash : Elevate your canine’s recall expertise with our canine waterproof leash. Perfect for out of doors actions like mountain climbing, tenting, and seashore play, it fosters higher obedience and a more in-depth bond.
Weatherproof Sturdiness : Crafted from PVC coated nylon webbing, our canine waterproof leash stays light-weight and robust even when moist. It is weatherproof, simple to scrub, anti-odor and excellent for all situations.
Sturdy and Gentle leash : Expertise a leash that is each sturdy and mild. With a outstanding 600 lbs pull drive resistance, it affords security and luxury in numerous climate situations.
Journey Prepared: Designed for lively out of doors moments, our canine leash stands as much as play, coaching, and exploration. It is a dependable companion for all of your escapades.
Multi coloration and dimension: We offer completely different colours to select from width 3/5 inch with size 5FT /10FT /15FT /30FT/ 50FT. Discover the proper match in your canine’s wants and your preferences.

Specification: Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)

Item Weight

Manufacturer

Country of Origin

Item model number

Date First Available

Item Package Dimensions L x W x H

Item Dimensions LxWxH

Brand Name

Target Audience Keyword

Directions

Warranty Description

Model Name

Color

Size

Material

Age Range Description

Breed Recommendation

Included Components

Specific Uses for Product

Brand

User Reviews

0.0 out of 5
0
0
0
0
0
Write a review

There are no reviews yet.

Be the first to review “Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)”

Your email address will not be published. Required fields are marked *

Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)
Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)

$19.98

PoochControl
Logo
Register New Account
Compare items
  • Total (0)
Compare
0
Shopping cart